Siddiqin Pumping Station

Study (A-II)

Status: Executed

Country: Lebanon

Location within country: South Lebanon

Staff: 6

This project was executed under previous consultant group consultancy & according to his design.

  • Drilling 7 deep water wells. with a depth of around 600m each and a Diameter from 17 ½;
  • Equipping them with boosters and pumps.
  • Construction of elevated reservoir.
  • Installing water pumps and boosters in Siddiqin and Kafra stations.
  • Laying transmission and distribution ductile iron pipes.

The project was executed within a short period to provide water to Villages in Bint Jbeil Caza after the Israeli departure from South Lebanon.

This project was financed by the World Bank.