Siddiqin Pumping Station
Study (A-II)
Status: Executed
Country: Lebanon
Location within country: South Lebanon
Staff: 6
This project was executed under previous consultant group consultancy & according to his design.
- Drilling 7 deep water wells. with a depth of around 600m each and a Diameter from 17 ½;
- Equipping them with boosters and pumps.
- Construction of elevated reservoir.
- Installing water pumps and boosters in Siddiqin and Kafra stations.
- Laying transmission and distribution ductile iron pipes.
The project was executed within a short period to provide water to Villages in Bint Jbeil Caza after the Israeli departure from South Lebanon.
This project was financed by the World Bank.