Supporting Project to Wadi Jilo I
Study (A-II)
Status: Executed
Country: Lebanon
Location within country: South Lebanon
Staff: 4
- Geological area studying & designating two locations to drill wells in order to require the needs of the region. Drilling deep water wells with a diameter from 17 1/2 inches. Design of reservoirs, equipping wells with boosters and pumps.
- Construction of administration buildings. Laying supplying and distributing pipelines with different diameters.
- Equipping the station with electronic control instruments and sterilization equipment.
This project benefited 15 villages.