Supporting Project to Wadi Jilo I

Study (A-II)

Status: Executed

Country: Lebanon

Location within country: South Lebanon

Staff: 4

  • Geological area studying & designating two locations to drill wells in order to require the needs of the region. Drilling deep water wells with a diameter from 17 1/2 inches. Design of reservoirs, equipping wells with boosters and pumps.
  • Construction of administration buildings. Laying supplying and distributing pipelines with different diameters.
  • Equipping the station with electronic control instruments and sterilization equipment.

This project benefited 15 villages.