Batoulieh Water Supply Project

Study (A-II)

Status: Executed

Country: Lebanon

Location within country: South Lebanon

Staff: 20

  • Geological and Hydrological studies works for the area between Tyre (north) and Mansouri (south) performing Geological & Hydrological maps, water shed map and Drilling 7 wells with a 20 inches diameter.
  • Equipping 7 wells with sterilizing & pumping equipment. Constructing a 1000m3 capacity concrete water tower Laying transmission pipelines around 11 000m with 24 inches diameter to the Siddiqin area .
  • The station was equipped with a laboratory for chemical & bacteriological analysis water. Installing electronic control instruments and sterilization equipment.

This project benefits 26 villages and small towns.